15 april 2026



Significant progress has already been made on site. The complete steel structure has been erected, including the roof purlins, forming the backbone of the building. Around the barn, prefab concrete walls have been installed, creating a solid and durable base. The roof has been finished with corrugated sheets combined with insulation, ensuring proper protection and a suitable indoor climate for livestock.
At this stage, our focus has shifted towards the concrete works, which are essential for the final usability of the barn:
✅ Installing floor reinforcement
✅ Setting up formwork for cubicle and internal walls
✅ Pouring and finishing concrete floors and walls
In the next phase, we will continue with finishing the exterior walls of the barn.
These works form the foundation for a robust, practical and future-proof dairy facility, designed for intensive daily use.
We would like to thank Niehl Dairy GbR for their trust and the pleasant cooperation throughout this project. 🤝
Also planning to build or renovate? Feel free to contact us at info@genugten-agri.nl – we’re happy to think along with you.